When work is done in a short period of time, the instantaneous power rate is ____ when the same amount of work is done over a longer period of time.

A. less than
B. greater than
C. equally the same as
D. not enough information is given


Answer: B

Trades & Technology

You might also like to view...

As a team, conduct an Internet search for data in a technical field of interest to your team that can be graphed by a computer-assisted method. Find a data set (or sets) of a size that would be difficult to enter by hand, download the data, and directly enter them into your graphing software. For each set, prepare a graph that follows engineering graphing standards as closely as your software allows. Within the graph, demonstrate the following:

• Multiple curves on a graph complete with a legend • Two separate y-axes Provide documentation to include: • Explanation and interpretation of the data you selected • Source of data • Hard copy from your software with data and graph

Trades & Technology

For making accurate cuts across the narrow dimension of gypsum board, always use a _____.

a. T-brace b. utility saw c. hook-bill knife d. T-square

Trades & Technology

The most important prerequisite to a career in the retail flower shop business include

a. artistic ability c. excellent physical coordination b. knowledge of chemistry and science d. aptitude for mathematics

Trades & Technology

What simple, systematic process allows commanders to maximize combat capability, while limiting risk?

a. Risk control. b. Safety control. c. Risk management. d. Safety management.

Trades & Technology