When work is done in a short period of time, the instantaneous power rate is ____ when the same amount of work is done over a longer period of time.
A. less than
B. greater than
C. equally the same as
D. not enough information is given
Answer: B
You might also like to view...
As a team, conduct an Internet search for data in a technical field of interest to your team that can be graphed by a computer-assisted method. Find a data set (or sets) of a size that would be difficult to enter by hand, download the data, and directly enter them into your graphing software. For each set, prepare a graph that follows engineering graphing standards as closely as your software allows. Within the graph, demonstrate the following:
• Multiple curves on a graph complete with a legend • Two separate y-axes Provide documentation to include: • Explanation and interpretation of the data you selected • Source of data • Hard copy from your software with data and graph
For making accurate cuts across the narrow dimension of gypsum board, always use a _____.
a. T-brace b. utility saw c. hook-bill knife d. T-square
The most important prerequisite to a career in the retail flower shop business include
a. artistic ability c. excellent physical coordination b. knowledge of chemistry and science d. aptitude for mathematics
What simple, systematic process allows commanders to maximize combat capability, while limiting risk?
a. Risk control. b. Safety control. c. Risk management. d. Safety management.