Your cotton picker broke down and was in the shop 5.5 days. The mechanics worked 24.6 hours at $76 per hour to repair the picker. The parts cost $2,318.04. You lost $21 per hour for not having the use of the picker. You work 12-hour days. What did the breakdown cost?
What will be an ideal response?
$5,573.64
You might also like to view...
Connecting rods in a four-stroke engine have ______ stamped on them for information purpose.
A. ID numbers B. codes C. clearance specifications D. "born on" date
The most common framing method used for building structural wood walls is called western framing or ____.
A. platform framing B. scaffold framing C. balloon framing D. MOD 24 framing
When replacing complete window and door units in existing walls, it is critical to determine if there is a ____ and if it is possible to integrate the new units and flashing effectively into it.
A. BST B. LKB C. PPC D. WRB
The position at which a set of DC motor armature conductors are moving parallel to field flux is called the _________________________.
Fill in the blank(s) with the appropriate word(s).