Before checking the switches in the circuit to a nonfunctioning load, the technician should first check:

A) Line voltage, control voltage, and voltage to the nonfunctional component.
B) The resistance of the nonfunctioning device.
C) The current draw of the nonfunctioning device.
D) The resistance of all the devices in the same circuit with the nonfunctional device.


A

Trades & Technology

You might also like to view...

What term describes the tubes located in the firebox that transfer water from the steam drum to the mud drum?

A) Risers B) Downcomers C) Superheater D) Desuperheater

Trades & Technology

A jumper wire is used to bypass a load device.

Answer the following statement true (T) or false (F)

Trades & Technology

The only place a bleed valve is needed is on top of the boiler.

Answer the following statement true (T) or false (F)

Trades & Technology

RFP stands for request for proposal.

Answer the following statement true (T) or false (F)

Trades & Technology