The operation sheet for machining an aluminum housing specifies 1 1/4 hour for facing, 1 3/4 hours for milling, 4/5 hour for drilling, 2/3 hour for tapping, and 1/4 hour for setting up. What is the total time allotted for this job?
What will be an ideal response?
1 1/4 + 1 3/4 + 4/5 + 2/3 + 1/4 = (75 + 105 + 48 + 40 + 15)/60 = 283/60 = 4 43/60
You might also like to view...
Andrew Jackson's military exploits were instrumental in the United States gaining
A. a peaceful and just conclusion to the territorial and settlement conflicts involving the Seminole Indians of Florida. B. possession of Florida from the Spanish. C. joint fishing rights in Labrador, Nova Scotia, and Newfoundland. D. naval limitations on the Great Lakes. E. gaining control of eastern Texas.
El tipo de concreto que se puede colocar sin utilizar una forma es concreto _____.
a. en masa b. compactado con rodillo c. precolocado d. pesado
When the axis of the hole at an extreme angle inside the positional tolerance zone. This is referred to as _________________________.
Fill in the blank(s) with the appropriate word(s).
Failure to open a dry-barrel hydrant fully will result in a reduced amount of available water and will contribute to:
A. sedimentation B. susceptibility to freezing C. difficulty in draining the main D. ground erosion.