Solve the problem.A manufacturer uses raw materials to produce p products each day. Suppose that each delivery of a particular material is $d, whereas the storage of that material is x dollars per unit stored per day. (One unit is the amount required to produce one product). How much should be delivered every x days to minimize the average daily cost in the production cycle between deliveries?

What will be an ideal response?


If he asks for a delivery every x days, then he must order (px) to have enough material for that delivery cycle. The average amount in storage is approximately one-half of the delivery amount, or . Thus, the cost of delivery and storage for each cycle is approximately
 Cost per cycle = delivery costs + storage costs
 Cost per cycle = d +  ? x
We compute the average daily cost c(x) by dividing the cost per cycle by the number of days x in the cycle.
 c(x) =  + 
We find the critical points by determining where the derivative is equal to zero.
 c'(x) = -  +  = 0
 x = ± 
Therefore, an absolute minimum occurs at  days.

Mathematics

You might also like to view...

Subtract.

A. 0 B. 16 C. 10 D. Not defined

Mathematics

The triangles are similar. Use them to find the length of side x.

A. x = 11 B. x = 10 C. x = 5 D. x = 15

Mathematics

Use properties of logarithms to expand the logarithmic expression as much as possible. Where possible, evaluate logarithmic expressions without using a calculator.log2

A. 4 - log2x
B. - 2log2x
C. 2 - log2x
D.

Mathematics

Solve and graph the solution set.y - 5 < -8

A. {y|y ? -3} or (-?, -3]

B. {y|y ? -3} or [-3, ?)

C. {y|y < -3} or (-?, -3)

D. {y|y > -3} or (-3, ?)

Mathematics