A process with a mean output of 16 and a standard deviation of output of 0.75 has been provided specification limits of 19 and 13. What is the Cpk value of this process?
a. 0.33
b. 1.33
c. 1.00
d. Not enough information to answer this question
b. 1.33
You might also like to view...
A(n) ______ occurs when an organization’s values, norms, and behavior are not aligned with the needs or demands of its environment.
a. economic gap b. strategic break c. culture gap d. social gap
Misappropriation of proprietary knowledge is an example of ________.
A. asset overstating B. inventory theft C. insider trading D. corporate espionage
Production complexity refers to ______.
A. the complexity and time involved in producing the product B. the complexity and time involved in marketing the product C. the complexity and time involved in advertising the product D. the complexity and time involved in designing the product
Sivret Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data:Total machine-hours80,000Total fixed manufacturing overhead cost$ 624,000Variable manufacturing overhead per machine-hour$ 3.10Â Recently, Job M598 was completed with the following characteristics:Number of units in the job60Total machine-hours300Direct materials$ 645Direct labor cost$ 9,000The unit product cost for Job M598 is closest to:
A. $160.75 B. $215.25 C. $65.25 D. $43.05