?In _____, systems analysts use prototyping to verify user requirements, after which the prototype is discarded and implementation continues.
A. ?design prototyping
B. ?throwaway prototyping
C. ?system prototyping
D. ?application prototyping
Answer:
A. ?design prototyping
B. ?throwaway prototyping
You might also like to view...
Answer the following statements true (T) or false (F)
1) WPF controls are ‘lookless,’ meaning that their appearance can be set by any control template. 2) A routed command declared in the XAML changes a control’s appearance when that control enters a certain state. 3) Data members declared as readonly must be initialized in their declaration. 4) The ItemsSource property of a ListView must refer to the name of a DataTemplate element. 5) CollectionViewSource provides multiple “views” of the same data.
The purpose of the ___________ protocol is to ensure the integrity of the communication.
a. HTTP b. IP c. TCP d. FTP
Which of the following is dependent upon determining human resources for the project?
A) economic feasibility B) operational feasibility C) tactical feasibility D) technical feasibility
The addressing system of the Internet is the Universal Resource Locator (URL)
Indicate whether the statement is true or false