Which of the following is true about qualifying the WPS?

A. It must be qualified to verify that the list of variables will provide a sound weld.
B. It is not necessary to keep a record of all parameters used to produce test welds.
C. The PQR is for the benefit of the welder; the inspection agency will not request it.
D. Sample welds are prepared using an established code or specification.


Answer: A

Trades & Technology

You might also like to view...

What is a deep foundation?

What will be an ideal response?

Trades & Technology

All of the following are types of thread inserts used in engine repairs, EXCEPT _____.

A. solid B. Smartsert C. Keensert D. heli-coil

Trades & Technology

The two words used to introduce a motion in parliamentary procedure are Ò____________________.Ó

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

A heating cable is embedded in a concrete slab to melt snow on a 5-m × 5-m surface area. The heating cable is heated electrically with joule heating. The concrete has a thermal conductivity of 1.4 W/m•K, and the layer between the slab surface and the heater surface is 50 mm. When the surface is covered with snow, the heat generated from the heating cable can melt snow at a rate of 0.1 kg/s. According to the National Electrical Code (NFPA 70), the power density (heat flux) for embedded snow-melting equipment should not exceed 1300 W/m2. Under the given conditions, does the concrete slab with the embedded heating cable operate in compliance with the NFPA 70 code? Also, to minimize thermal stress in the concrete, the temperature difference between the heater surface (T1) and the slab

surface (T2) should not exceed 21°C (2015 ASHRAE Handbook—HVAC Applications, Chap. 51). Do the current operating conditions allow T1 ? T2 ? 21°C?



What will be an ideal response?

Trades & Technology