If a soils report for a potential construction site was prepared under a contract with the owner prior to advertising for bids, indicate which of the following may be properly included in the Contract Documents without excessive risk:
A. log of borings.
B. soils report.
C. subsurface contours.
D. interpretations of subsurface conditions.
E. recommendations of the soils engineer.
A
You might also like to view...
Disposable cylinders of HFC-407C are colored _____.
a. orange with a gray top b. yellow c. blue-gray d. brown
Heating COP is calculated by dividing Btuh output by _____
a. kW output × 3,413 b. 3.413 × kWH c. kW input × kWH d. kW input × 3,413
The term ____________________ is used to describe an electrical connection between the casing of equipment or tools and the earth.
Fill in the blank(s) with the appropriate word(s).
____ is a three-dimensional mathematical system.
A. Geometrical datum targeting B. Geometrical datums and tolerancing C. Geometrical dimensioning and targeting D. Geometric dimensioning and tolerancing