Evaluate.log
A. -5
B. -
C. -1
D.
Answer: B
You might also like to view...
Evaluate the integral.
A. (e2x - e-2x) + C
B. (e2x + e-2x) + C
C. (e2x + e-2x) + 2x + C
D. (e2x - e-2x) + 2x + C
Find the missing numbers. Round rates to the nearest tenth of a percent and dollar amounts to the nearest cent.
A. Markup: $35.07 Selling Price: $88.21 B. Markup: $80.52 Selling Price: $133.66 C. Markup: $119.14 Selling Price: $172.28 D. Markup: $66.00 Selling Price: $119.14
Find the x- and y-intercepts of f.f(x) = -x2(x + 6)(x2 - 1)
A. x-intercepts: -1, 0, 1, 6; y-intercept: 0 B. x-intercepts: -6, 0, 1; y-intercept: -6 C. x-intercepts: -6, -1, 0, 1; y-intercept: -6 D. x-intercepts: -6, -1, 0, 1; y-intercept: 0
Solve the problem.Supertankers off-load oil at a docking facility shore point 5 miles offshore. The nearest refinery is les east of the docking facility. A pipeline must be constructed connecting the docking facility with the refinery. The pipeline costs $300,000 per mile if constructed underwater and $200,000 per mile if over land.
Locate point B to minimize the cost of construction.
A. Point B is 3.51 miles from Point A. B. Point B is 5.66 miles from Point A. C. Point B is 2.50 miles from Point A. D. Point B is 4.47 miles from Point A.