What does OBD II call the specific conditions that must be met before each monitor will run?

What will be an ideal response?


Each monitor has a specific set of Enable Criteria, which are specific conditions that must be met before each monitor will run.

Trades & Technology

You might also like to view...

The maximum power that can be produced by the turbine is nearest:


A) 14.8 MW
B) 16.7 MW
C) 18.1 MW
D) 20.3 MW

Trades & Technology

Circular root growth tends to _____

A) girdle the root system B) restrict growth C) kill the trees in severe cases D) all of the above

Trades & Technology

Describe the operation of the immobilizer system.

What will be an ideal response?

Trades & Technology

This is a feature added to a sheet metal part to reinforce or stiffen a part edge or to provide a surface for fastening or welding.

What will be an ideal response?

Trades & Technology