Technician Brett used
?hours to install 16 PV panels on a house roof. Find the average time Brett needed to install each panel.
Fill in the blank(s) with the appropriate word(s).
hours
You might also like to view...
What is the difference between overcurrent protection and overload protection?
What will be an ideal response?
Wire rope should be checked for:
A. kinking B. abrasion C. broken wires D. all of the above
A CAD operator needs to calculate the total cost of the wall switches for a building with 7 floors. On each floor, there are 16 single-pole, single-throw switches at $1.82 each; 15 single-pole, double-throw switches at $2.25 each; and 13 doublepole, double-throw switches at $3.37 each. What is the cost of the switches for the entire building?
What will be an ideal response?
The distance that you should look ahead of your vehicle while driving amounts to about ____ mile at highway speed.
a. 1/12 b. 1/8 c. 1/4 d. 3/4