Flat-slab formwork is more costly to build because of the _____.
a. need for special shoring
b. amount of material required
c. complex reinforcement that must be built
d. drop panels required at each column
d. drop panels required at each column
You might also like to view...
A semicircular-sided tank is welded in the shop. The length of the tank’s bottom, shown in the figure, is 25”, and the radius is 6”. How long is the piece of metal used to form the sides of the tank, in inches? Round the answer to the nearest 1/16”.
What entity is responsible for monitoring animal products for residues resulting from feed additives and medications?
A. Food and Drug Administration (FDA) B. Department of the Treasury C. United States Department of Agriculture D. The Surgeon General
In induction heating, the material is heated due to ________
A) eddy currents B) the fact that the material acts like an open C) high load reactance D) hysteresis
In a real project the first step of definition often involves some ________ on the part of the project manager
Fill in the blank(s) with correct word