If a National Pollutant Discharge Elimination System (NPDES) permit is granted to a construction site, the site must also have a _____.
a. hazardous waste manifest
b. generator EPA ID number
c. storm water pollution prevention plan
d. waste minimization plan
c. storm water pollution prevention plan
You might also like to view...
In an amusement park, wireless devices are used to post the queue length and wait time for each of the rides. Can you think of an infrastructure that could enable patrons to do online interaction? Assume appropriate requirements and a potential solution.
You do need some software support. Can you think and outline how you would go about acquiring this? Explain.
Technician A says that a blower motor can be tested using a fused jumper lead. Technician B says that a blower motor can be tested using a clamp-on ammeter. Which technician is correct?
A) Technician A B) Technician B C) Both technicians D) Neither technician
The layer 4 and 3 protocols used to carry VoIP across the Internet are:
A) UDP/IPX B) TCP/IP C) RTP/IP D) UDP/IP E) All of the above
What is an engineering change notice?
What will be an ideal response?