The manufacture of a certain part requires two different machine operations. The time on machine 1 has mean 0.5 hours and standard deviation 0.4 hours. The time on machine 2 has mean 0.6 hours and standard deviation 0.5 hours. The times needed on the machines are independent. Suppose that 100 parts are manufactured.

a. What is the probability that the total time used by machine 1 is greater than 55 hours?
b. What is the probability that the total time used by machine 2 is less than 55 hours?
c. What is the probability that the total time used by both machines together is greater than 115 hours?
d. What is the probability that the total time used by machine 1 is greater than the total time used by machine 2?


Trades & Technology

You might also like to view...

Which boiler control prevents a low-water condition from occurring?

a. aquastat b. high limit control c. low-water fuel cut-off d. temperature-limiting control

Trades & Technology

Fusion welding is joining parts by ____________________ them together

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

The applied voltage and the induced voltage are ____ degrees out of phase with each other in an inductive circuit.

A. 30 B. 60 C. 90 D. 180

Trades & Technology

The letter ____________________ in the AISI system, if used, indicate the manufacturing process basic open-hearth or electric furnace steel and basic oxygen furnace steel.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology