Material cost for a job is $1,540. The material cost is 20.25% of the total cost. What is the total cost? Round the answer to the nearest dollar.
A. $7,684
B. $7,008
C. $7,605
D. $8,286
Answer: C
You might also like to view...
A wiring diagram showing in detail the electrical components and circuitry is known as a ____.
a. schematic b. blueprint c. block diagram d. service detail
Two technicians are discussing testing coolant for proper pH. Technician A says that coolant has a pH above 7 when new and becomes lower with use in an engine. Technician B says that OAT and HOAT coolants have a lower pH when new compared to the old green IAT coolant. Which technician is correct?
A) Technician A only B) Technician B only C) Both technicians A and B D) Neither technician A nor B
___ welds are used when welding pipe in a straight line.
Fill in the blank(s) with the appropriate word(s).
When projecting a plane into another view, you must first find at least four points in the plane and project each point into the next view.
Answer the following statement true (T) or false (F)