Carry the answer to two decimal places. A contractor requires the following for a job: BX cable, $32.65; conduit pipe, $12.56; toggle switches, $24.45; and octal boxes, $7.50. What is the total cost?
Fill in the blank(s) with the appropriate word(s).
$77.16
You might also like to view...
Mudsills are used to support shores _____.
a. if the ground is not frozen b. beneath each floor of the building c. if forms are to be left in place d. when a slab-on-grade has not been placed and cured
Why is it important that the structural draft er be a reliable person?
What will be an ideal response?
Technician A says that you only have to pay for a test one time; if you fail you can take it again for free
Technician B says that a photo ID is needed to enter the test center. Which technician is correct? A) Technician A only B) Technician B only C) Both technicians A and B D) Neither technician A nor B
Of the following choices, the warmest temperature is ____.
A. 20°C B. 303°K C. 501°R D. 77°F