Complete.6 pt =  cups

A. 26
B. 12
C. 24
D. 13


Answer: D

Mathematics

You might also like to view...

Use the two steps for solving a linear programming problem to solve the problem.An automotive glass plant must be able to fill orders for 230 truck windshields, 350 auto windshields, and 310 RV windshields. Because the first shift crews are more experienced, they are each able to make 7 truck windshields, 12 auto windshields, and 9 RV windshields. The second shift crews are able to produce 4 truck windshields, 12 auto windshields, and 7 RV windshields. The more experienced first shift crews cost the company $360.00 per crew per shift and the second shift crews each cost $310.00 per shift. The company's facilities will handle at most 50 crews on each shift, and they must have at least 10 crews come in to keep the plant running. How many first shift and how many second shift crews should

they schedule to minimize costs? A. 37 first shift crews and 36 second shift crews B. 51 first shift crews and 17 second shift crews C. 43 first shift crews and 24 second shift crews D. 28 first shift crews and 10 second shift crews

Mathematics

The lengths of the legs of a right triangle are given. Find the hypotenuse. If necessary, round to three decimal places.a = 5, b = 7

A. 4.899 B. 3.464 C. 1.414 D. 8.602

Mathematics

Perform the indicated operation and write the answer in lowest terms. + 

A.
B.
C.
D.

Mathematics

Graph the solution set of the system of linear inequalities. If the system has no solutions, state this.

A.

B.

C.

D.

Mathematics