Economic decision analysis in the construction industry is referred to as the ____.

A. delivery costing technique
B. value costing technique
C. life-cycle costing technique
D. minimal costing technique


Answer: C

Trades & Technology

You might also like to view...

If two sides of a triangular lot are 90 feet and 120 feet and meet at a 90-degree angle, the length of the third side of the lot is _____.

a. 120 feet b. 150 feet c. 180 feet d. 240 feet

Trades & Technology

Controlling ____________________ in plantings will reduce competition for soil water

Fill in the blank(s) with correct word

Trades & Technology

A coolant leak will show as what color?

A) Green B) Red C) Orange D) Any of the above, depending on the type of coolant

Trades & Technology

Which pins of the DLC should be connected in order to retrieve "flash" codes from a GM OBD I PCM?

A) A and B B) D and E C) A and D D) A and C

Trades & Technology