What additional skills must the estimator have to be able to take a quantity survey and turn it into a detailed estimate?
What will be an ideal response?
a. Be able, from looking at the drawings, to visualize the project through its various phases of construction.
b. Have enough construction experience to possess a good knowledge of job conditions, including methods of handling materials on the job, the most economical methods of construction, and labor productivity.
c. Have sufficient knowledge of labor operations and productivity to thus convert them into costs on a project.
d. Be able to keep a database of information on costs of all kinds, including those of labor, material, project overhead, and equipment, as well as knowledge of the availability of all the required items.
e. Be computer literate and know how to manipulate and build various databases and use spreadsheet programs and other estimating software.
f. Be able to meet bid deadlines and still remain calm. Even in the rush of last-minute phone calls and the competitive feeling that seems to electrify the atmosphere just before the bids are due, estimators must “keep their cool.”
g. Have good writing and presentation skills.
You might also like to view...
Laminated veneer lumber (LVL) and plywood members are both made by gluing together approximately 1/8-in.-thick wood veneers. What is the difference between the two members in how the wood grain in veneers is oriented?
What will be an ideal response?
Explain the difference between structural concrete and insulating concrete.
What will be an ideal response?
The controlling unit for an electronically shifted transmission is the ________
A) TCM B) Vehicle speed sensor C) Throttle position sensor D) None of these
If there was a current flow of 6 amperes in a 120-V circuit, the resistance of the circuit would be ____________________ ohms.
Fill in the blank(s) with the appropriate word(s).