One drawback of using custom made, pre-measured duct sections is that ____.

A. if the measuring was not done correctly, the job may not go together
B. the sharp edges provide possible safety issues
C. altering a duct section at the job site is extremely cost-ineffective
D. all of the above


Answer: D

Trades & Technology

You might also like to view...

A measure of success of a CSIRT's operations may be determined through how well its goals are being met.  Give three examples of possible CSIRT goals.

What will be an ideal response?

Trades & Technology

A(n) ____________________ transmits motion from the starter to the flywheel, but not from the flywheel to the starter.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

During the nineteenth century, colonial soldiers, both European and indigenous, often went for long stretches without what?

a. pay b leave c. ammunition d. alcohol

Trades & Technology

Many cooling systems use a surge or pressure tank, also called a (an) __________.

A. water pump B. evaporator C. receiver/dryer D. degass bottle

Trades & Technology