Underground service conductors installed as a cable assembly are required to be buried at least __________ feet by the NECĀ®.
a. 1
b. 2
c. 3
d. 4
b. 2
You might also like to view...
When a drawing includes all of the information needed for the manufacture of a part, including all necessary views, notes, symbols, and dimensions it is a working drawing.
Answer the following statement true (T) or false (F)
The General Motors mild (assist) hybrid system uses what type of motor/generator?
A) A motor/generator located inside the transmission/transaxle B) A conventional but larger than normal alternator and starter C) A belt operated motor/generator D) Induction type motor located between the engine and the transmission
The published SEER rating of a unit is accurate:
A) Only at the AHRI "A" design condition. B) Only with an AHRI match coil. C) With any coil under any condition. D) With any coil the unit is connected to.
Each power steering unit needs 10 1/4 inches of power steering return hose. How many inches of hose are needed to replace the hose in seven units?
A. 65 1/2 B. 67 5/8 C. 71 3/4 D. 76