If a job is delayed due to late delivery of materials, the crew leader should _____

a. demand a discount from the supplier to compensate for the delay
b. get in the habit of checking with the supplier in advance of the scheduled delivery
c. contact the home office and advise them to drop the supplier from their list
d. refuse the late delivery and re-order the materials from another supplier


b

Trades & Technology

You might also like to view...

_______ is a plant hormone thought to be important for induction of fruit development following seed set.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

El componente etiquetado con el número 6 en la Figura 1 es un:



a. juego de sello de extremo.
b. juego de empalme.
c. juego de conexión de energía.
d. juego T.

Trades & Technology

With the design-build method, the owner indicates that he or she requires a certain facility and usually outlines some parameters relating to location, size, design, and the desired time of occupancy.

Answer the following statement true (T) or false (F)

Trades & Technology

___________ ____________ _______________ is determined by the ratio of usable power at the crankshaft to the power supplied to the engine as the energy content of the fuel.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology