A VMware vSphere 6.x Administrator has been tasked with enabling the Integrated Load Balancer for the new vRealize Log Insight cluster. What three options are required before the Integrated Load Balancer can be used? (Choose three.)
A. The time on the vRealize Log Insight virtual appliance must be synchronized with an NTP server.
B. All vRealize Log Insight nodes are configured as the same size.
C. The vRealize Log Insight master and work nodes must have CA signed certificates.
D. Verify that all vRealize Log Insight nodes and the specified Integrated Load Balancer IP address are on the same network.
E. The vRealize Log Insight master and worker nodes must have the same certificates.
Answer:
A. The time on the vRealize Log Insight virtual appliance must be synchronized with an NTP server.
D. Verify that all vRealize Log Insight nodes and the specified Integrated Load Balancer IP address are on the same network.
E. The vRealize Log Insight master and worker nodes must have the same certificates.
You might also like to view...
Access to high-speed broadband communication lines can be accomplished by using a ___________.
a. cable modem b. DSL connection c. either B or C d. neither B nor C
Named after two protocols, _________________ is really several subprotocols, designed to work together.
Fill in the blank(s) with the appropriate word(s).
In an image-editing program, a virtual memory scheme:
a. creates a 3D model of an image. b. uses hard disk space as RAM. c. uses RAM to store disk images. d. looks for patterns in an image. e. allows two users to work on an image at the same time.
When an animation has a trigger, the number in the animation sequence icon is replaced with a(n) star. _________________________
Answer the following statement true (T) or false (F)