OSHA CFR 1910 is the standard for _____.
a. general industry
b. electronic systems
c. the construction industry
d. lockout/tagout
a. general industry
You might also like to view...
Which of the following bids locks you into a fixed, final contract price?
a. lump sum: yes b. time and materials: no, time and materials may be adjusted c. cost plus fixed fee: no, fee remains fixed but other costs may be adjusted
When the building department approves the completed construction, it issues a certificate of ____.
A. construction B. zoning C. permission D. occupancy
Which of the following statements for the Logix processors is NOT true?
A) The timer output is triggered when the ACC is equal to or greater than the PRE value. B) Logix processors use a tag name in place of a timer file number. C) Logix has a fixed time base of 0.001 seconds. D) Tag values are monitored using the edit tab on the tags dialog box.
An RLC parallel circuit has an applied voltage of 240 V. R = 60 ?, XL = 80 ?, and XC = 40 ?. What is the apparent power?
A. 300 VA B. 1200 VA C. 1400 VA D. 1440 VA