Which of the following is a correct interpretation of the acronym PLC when it is used in the context of trailer wiring?
A. power line carrier
B. protocol language communications
C. priority line communication
D. positive linear corollary
Answer: A
You might also like to view...
Answer the following statement(s) true (T) or false (F)
1. In the accompanying figure, the timing relay coil (TR) is energized with the secondary starter coil (F).
2. In the accompanying figure, the timer setting should be adjusted for the maximum time required to accelerate the
motor to the point that it can reach the synchronous speed after contact TR closes.
Which of the following is used to step voltage down to lower levels before it reaches a home or office?
a. Transformer b. Generator c. Conductor d. Insulator
To speed up evacuation, you should:
A) Use large diameter, long hoses. B) Use small diameter, long hoses. C) Use large diameter, short hoses. D) Use small diameter, short hoses.
Loose, flaky rust should be removed from reinforcing steel by using a _____
a. power grinder b. solvent c. wire brush d. propane torch