Measuring a drawing with an architect's or engineer's scale ____.
A. makes precision easier
B. should be encouraged
C. is poor practice
D. is standard practice
Answer: C
You might also like to view...
The lath in stucco, applied on a stud wall, must be backed by a water resistant layer?typically two layers of No. 15 roofing felt or one layer of No. 30 roofing felt. The assembly also requires an air-weather barrier (AWB). Explain why the roofing felt cannot function as an AWB in addition to providing water resistance. Which material is used as an AWB with stucco?
What will be an ideal response?
In general terms, explain two ways that auxiliary contacts are used.
What will be an ideal response?
All radial tires are belted
Indicate whether the statement is true or false
Collector feedback bias works on what principle?
A) positive feedback adds to collector current B) base current will always remain constant C) rising collector currents tend to attenuate base current D) falling collector currents tend to attenuate base current