Pervious asphalt is installed with ____.

A. an 8-inch sub base and an open structure in the finish layer that is different from pervious concrete
B. the same sub base and a similar open structure in the finish layer as pervious concrete
C. a very shallow sub base and a similar open structure in the finish layer as pervious concrete
D. the same sub base as pervious concrete but an open structure in the finish layer that is different from pervious concrete


Answer: B

Trades & Technology

You might also like to view...

Red staining of fixtures is a symptom of which type of water problem?

a. turbidity b. hardness c. acidity d. dissolved iron

Trades & Technology

When a chain hoist is used for engine removal, the car's hood must first be removed.

Answer the following statement true (T) or false (F)

Trades & Technology

The major components of an air-handling unit include:

A) Compressor, evaporator, and condenser. B) Fan and motor, heating and cooling coils, air filter, dampers. C) Air compressor, water separator, and air tank. D) Heating and cooling coils and electric heat strips.

Trades & Technology

Which of the following is not a standard digital code?

A) ARRL B) ASCII C) Gray

Trades & Technology