A CAD drafter predicts that a specific job should take 150 hours. The number of hours it takes to complete the job is 12% less than the predicted time. Find the number of hours the CAD drafter takes to complete this job.
What will be an ideal response?
132 hours
You might also like to view...
?All of these statements about frame yield strength are true EXCEPT:
A. ?It is a measure of the material from which the frame is manufactured B. ?It is an indication of the maximum load that may be placed on a material without distorting the material C. ?Yield strength is measured in pounds per square inch D. ?Yield strength is a measurement of the amount of heat a material will withstand before distorting the material
What body of water was thought to be lost forever?
a. Lake Erie b. Potomac River c. Salt Lake d. Ohio River
Which of these should never be used as windshield washer fluid?
A) Pure water B) 50 % Washer fluid and 50% water mixture C) Ethylene Glycol D) 20 % Washer fluid and 80% water mixture
When a regulator has two stages, the first regulator stage is usually _____
a. adjustable within a small range b. adjustable within a wide range c. preset to an intermediate pressure d. preset to 0 psig