A CAD drafter predicts that a specific job should take 150 hours. The number of hours it takes to complete the job is 12% less than the predicted time. Find the number of hours the CAD drafter takes to complete this job.

What will be an ideal response?


132 hours

Trades & Technology

You might also like to view...

?All of these statements about frame yield strength are true EXCEPT:

A. ?It is a measure of the material from which the frame is manufactured B. ?It is an indication of the maximum load that may be placed on a material without distorting the material C. ?Yield strength is measured in pounds per square inch D. ?Yield strength is a measurement of the amount of heat a material will withstand before distorting the material

Trades & Technology

What body of water was thought to be lost forever?

a. Lake Erie b. Potomac River c. Salt Lake d. Ohio River

Trades & Technology

Which of these should never be used as windshield washer fluid?

A) Pure water B) 50 % Washer fluid and 50% water mixture C) Ethylene Glycol D) 20 % Washer fluid and 80% water mixture

Trades & Technology

When a regulator has two stages, the first regulator stage is usually _____

a. adjustable within a small range b. adjustable within a wide range c. preset to an intermediate pressure d. preset to 0 psig

Trades & Technology