In a CPMT, a(n) ____ leads the project to make sure a sound project planning process is used, a complete and useful project plan is developed, and project resources are prudently managed.

A. incident manager
B. champion
C. crisis manager
D. project manager


Answer: D

Trades & Technology

You might also like to view...

____________________ is a synthetic crystal that when exposed to the intense light from the flash tubes can produce high quantities of laser energy.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

On a jointer, the infeed table should be _____ below the outfeed table

a. 1 inch c. 1/16 inch b. 1/2 inch d. 1/64 inch

Trades & Technology

Why is a pressure regulator necessary when using nitrogen cylinders?

A) To boost the pressure leaving the nitrogen cylinder high enough to be used B) Because the nitrogen must be carefully controlled since it is toxic C) Because the nitrogen is extremely expensive and must be carefully rationed D) To reduce the pressure in the nitrogen cylinder to a safe level

Trades & Technology

TheĀ  filter drier:

A. Removes moisture from the refrigeration system B. Filters out impurities C. Contains a product called desiccant D. All of the above are true of the drier

Trades & Technology