The signal that represents the difference between the control signal and the feedback signal is called the ____.
A. feedback signal
B. error signal
C. reference signal
D. sawtooth signal
Answer: B
Trades & Technology
You might also like to view...
When looking at the front view of the part, how far from the bottom of the part are the holes at the top of the part to be located?
Review drawing number 522973A0A and then answer the question.
Trades & Technology
An example of an insect order that contains many species that cause problems in horticultural crops is Homoptera
Indicate whether the statement is true or false
Trades & Technology
The estimator measures the surface area of the concrete that comes into contact with the forms; this is known as the ____.
A. contact area B. displacement area C. adsorption area D. footing area
Trades & Technology
List five steps required to apply GDT to the design process
What will be an ideal response?
Trades & Technology