?Which configuration allows heat to be transferred to the load as quickly as possible after the heat source turns on?

A. ?2-pipe buffer tank configuration
B. ?4-pipe buffer tank configuration
C. ?6-pipe buffer tank configuration
D. ?vertical flow jet configuration


Answer: A

Trades & Technology

You might also like to view...

The perimeter around a rectangular ground source heat exchange bed 24 ft. long and 16 ft. wide is 384 ft.?

Answer the following statement true (T) or false (F)

Trades & Technology

What is meant by the pesticide application direction "spray to runoff"?

What will be an ideal response?

Trades & Technology

Assume that a 7805 regulator has a measured no-load output of 5.26 volts and a full-load output of 5.19 volts. What is the load regulation expressed as a percentage?

A) 1.28% B) 1.18% C) 1.35% D) 1.19%

Trades & Technology

During panel lifting and bracing, only the erection team is allowed in the _____.

a. danger zone b. boom swing arc c. controlled-access zone d. lifting perimeter

Trades & Technology