Retempering of mortar, if needed, should be generally done within ______.

A) 1 h of the initial preparation of mortar.
B) 4 h of the initial preparation of mortar.
C) 5-1/2 h of the initial preparation of mortar.
D) 2-1/2 h of the initial preparation of mortar.
E) none of the above.


D) 2-1/2 h of the initial preparation of mortar.

Trades & Technology

You might also like to view...

When large plants grown in the field are dug up for sale, plastic is wrapped around the root system

Indicate whether the statement is true or false

Trades & Technology

Two elements are connected in series as shown in Fig. 9.40. If i = 12 cos (2t - 30°) A, find the element values.

Trades & Technology

When is the air coil in a water source heat pump the acting evaporator?

A) in the cooling cycle B) in the heating cycle C) in the defrost cycle D) only when the unit is operating

Trades & Technology

As a CAD technician, visiting construction sites of projects that you've worked on can be helpful in advancing in the office.

Answer the following statement true (T) or false (F)

Trades & Technology