Retempering of mortar, if needed, should be generally done within ______.

A) 1 h of the initial preparation of mortar.
B) 4 h of the initial preparation of mortar.
C) 5-1/2 h of the initial preparation of mortar.
D) 2-1/2 h of the initial preparation of mortar.
E) none of the above.


D) 2-1/2 h of the initial preparation of mortar.

Trades & Technology

You might also like to view...

Two elements are connected in series as shown in Fig. 9.40. If i = 12 cos (2t - 30°) A, find the element values.

Trades & Technology

When is the air coil in a water source heat pump the acting evaporator?

A) in the cooling cycle B) in the heating cycle C) in the defrost cycle D) only when the unit is operating

Trades & Technology

As a CAD technician, visiting construction sites of projects that you've worked on can be helpful in advancing in the office.

Answer the following statement true (T) or false (F)

Trades & Technology

When large plants grown in the field are dug up for sale, plastic is wrapped around the root system

Indicate whether the statement is true or false

Trades & Technology