If the floor of a steel-frame building has only primary and secondary components, the secondary components consist of

A) joist girders.
B) floor deck.
C) W-section beams.
D) steel joists.
E) none of the above.


B) floor deck.

Trades & Technology

You might also like to view...

Facilities that provide long-term storage of seeds or other plant parts for genetic preservation are called ________.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Which of the following should process technicians look for in the operation and maintenance of compressors?

A. Oil levels B. Flow rates C. Liquid levels D. All of the above

Trades & Technology

A CAD drafter predicts that a specific job should take 150 hours. The number of hours it takes to complete the job is 12% less than the predicted time. Find the number of hours the CAD drafter takes to complete this job.

What will be an ideal response?

Trades & Technology

White, or natural gray-colored insulation is ____.

A. unrestricted in usage B. restricted from usage on any grounding conductor C. restricted from usage on any grounded conductor D. restricted from usage on any ungrounded conductor

Trades & Technology