The architect/engineer requires that shop drawings be submitted before _____.

a. the pre-construction phase
b. material and equipment is delivered
c. the pre-bid phase
d. the construction phase


b. material and equipment is delivered

Trades & Technology

You might also like to view...

Community gardens typically have one plot that members share

Indicate whether the statement is true or false.

Trades & Technology

The ____ is the ratio of the drawing size to the actual size of the object.

A. extension B. dimension C. perspective D. scale

Trades & Technology

Technician A says that changing connecting rod length changes engine stroke. Technician B says that changing connecting rod length changes the position of the piston in the cylinder. Which technician is correct?

A) Technician A only B) Technician B only C) Both technicians A and B D) Neither technician A nor B

Trades & Technology

One problem with analog signals is that they have:

A) greater signal degradation B) complex waveforms C) multiple frequencies to deal with D) increased noise on the line E) all of the above

Trades & Technology