The architect/engineer requires that shop drawings be submitted before _____.
a. the pre-construction phase
b. material and equipment is delivered
c. the pre-bid phase
d. the construction phase
b. material and equipment is delivered
You might also like to view...
Community gardens typically have one plot that members share
Indicate whether the statement is true or false.
The ____ is the ratio of the drawing size to the actual size of the object.
A. extension B. dimension C. perspective D. scale
Technician A says that changing connecting rod length changes engine stroke. Technician B says that changing connecting rod length changes the position of the piston in the cylinder. Which technician is correct?
A) Technician A only B) Technician B only C) Both technicians A and B D) Neither technician A nor B
One problem with analog signals is that they have:
A) greater signal degradation B) complex waveforms C) multiple frequencies to deal with D) increased noise on the line E) all of the above