Discuss how to determine the location of the building using the site plan.
What will be an ideal response?
The building location is given on the site plan by referring to existing points such as the centerline of a street. If the electrical contractor and the crew arrive on the site before the general contractor arrives, they are not required to "stake out" (locate) the building. However, they should be able to determine its approximate location. A site plan shows the property lines and the centerlines of the street from which the electrician can locate the building and other site improvements.
You might also like to view...
What is removed when an air tank is drained
A. Water and oil B. Ammonia C. Liquid cleaners
The cost of the jobsite facility is not included in the budget established by the estimate.
Answer the following statement true (T) or false (F)
A(n) __________________ is a building with many individually owned living areas or units
Fill in the blank(s) with the appropriate word(s).In the ____, as the elevation increases, the temperature also increases because the atmospheric gases absorb the sun's ultraviolet light energy as a form of energy that we perceive as heat
A) thermosphere B) troposphere C) exosphere D) stratosphere