To transfer elevations up a structure, first establish a temporary benchmark at the base, then locate a second
temporary benchmark at the desired floor or level using a(n) _____.
a. builder's level
b. auto level
c. laser level
d. tape
d
You might also like to view...
Transportation in colonial America was
A. surprisingly fast for the time. B. safer by road than by any other means. C. slow by any of the means available. D. so poor that no mail service was established until the 1800s. E. fast only on the waterways.
Perhaps the biggest advantage of a photovoltaic system is a(n) ____________________ in the future.
Fill in the blank(s) with the appropriate word(s).
The scale which permits reading a micrometer to .0001 inch is called the:
A) Micro B) Vernier C) Milli D) Decimal
The last step in project management includes system ________ and ________
Fill in the blank(s) with correct word