Maintaining Quality Control on phlebotomy supplies and equipment is part of which phase of laboratory testing?
A. Preanalytical
B. Postanalytical
C. Postexamination
D. Examination
Answer: A
You might also like to view...
What is -rrhage
What will be an ideal response?
Modified wave scheduling helps avoid the possibility that any patient would have to wait 45 minutes to be seen by the physician.
Answer the following statement true (T) or false (F)
Speed settings of 32 and 160 mm/min on a water-sealed spirometer can be used to measure which of the following?
1. Minute ventilation 2. Peak expiratory flows 3. Maximum voluntary ventilation 4. Forced vital capacity maneuvers a. 1 and 2 c. 2 and 4 b. 1 and 3 d. 3 and 4
Which of the following would be considered a device in PCS and would be assigned a value?
a. Suture b. Mesh used for hernia repair c. Jackson-Pratt drain d. Radiologic markers