Which documents are not part of the project manual?
a. Contract items
b. Specifications
c. Sequence cost comparison
d. Bidding documents
c. Sequence cost comparison
You might also like to view...
When a code 111 is displayed on MD/SM, which of the following should be true?
A. No logged historic codes B. No active codes C. No ECM to J1939 communication D. The ECM should be replaced
Bench testing of a starter should be done __________
A) After reassembling an old starter B) Before installing a new starter C) After removing the old starter D) Both A and B
Gas fired rooftop units are normally vented though
A) Draft hoods connected directly to the unit B) A separate power venter C) Double wall vent pipe connected to the top of the unit D) Double wall vent pipe connected to the side of the unit
In addition to protecting other workers from exposure to electric arcs, welding screens _____
a. prevent drafts from interfering with the stability of the arc b. reduce glare on the workpiece c. mark a confined space d. support workpieces for overhead welding