What risks does a construction company assume by taking on an extremely large project, e.g., one that requires use of 60 percent of its resources?

What will be an ideal response?


The major risks are the need to finance significant cash flow requirements, overextension of managerial expertise or resources, and adverse financial impact in case the project is unprofitable.

Trades & Technology

You might also like to view...

Silver thiosulfate prevents bacterial growth and blocks ethylene action in cut flowers

Indicate whether the statement is true or false

Trades & Technology

Excessive overhang of the tool and toolholder:

A) Might cause the toolholder to turn in the tool post and the tool to dig in B) Might cause a ruined thread C) Is generally less rigid D) All of the above

Trades & Technology

During most engine work the oil pump is usually ________

A) Painted and reused B) Replaced with an electric pump C) Replaced with a new oil pump D) Upgraded to a high pressure pump

Trades & Technology

Which government agency regulates dangerous goods that are to be transported via aircraft?

a. OSHA b. FAA c. DOT d. EPA

Trades & Technology