Except for federal contracts, if a change is required in the Contract Documents after signing a contract for construction, the type of document used to implement that change is called:
A. a change order
B. a field order
C. an addendum
D. a shop drawing
E. a Notice to Proceed
A
Trades & Technology
You might also like to view...
? Identify and state the historical significance of John Quincy Adams.
What will be an ideal response?
Trades & Technology
Birds being produced for hunting or restocking of a wild population need a _____.
Fill in the blank(s) with the appropriate word(s).
Trades & Technology
Like coaxial lines, waveguides are perfectly shielded, which allows for no _____________
A. radiation loss B. power loss C. energy loss D. noise
Trades & Technology
A diary is really the employee's property.
Answer the following statement true (T) or false (F)
Trades & Technology