What are the three times at which delays could be analyzed on construction projects?
What will be an ideal response?
Potential construction delay claims should be addressed at the earliest possible time. This includes the design and specification preparation stage for the owner and architect/engineer and the bid preparation period for the contractor. By focusing and concentrating on the potential for delay claims right from the inception of projects, prudent actions could be taken by the participants to significantly reduce the number and magnitude of delay claims. Efforts in this regard should continue from the pre-construction phase to the actual construction phase and through the post construction period should any unresolved claims remain outstanding.
You might also like to view...
Find the probability when
(a) k = 2 and ? = 0.01 for Poisson distribution. (b) p = 0.01 and k = 2 for geometric distribution. (c) Repeat (b) when binomial distribution is used and n = 10.
All of these are classifications of hybrid designs except:
A. Mild B. Strong C. Parallel D. Series
Horticulture deals with the cultivation of fruits, vegetables, flowers, trees and shrubs
Indicate whether the statement is true or false
Given the circuit in Fig. 3.53, calculate the currents i? through i?.