Assume that an engineering course term project is broken down into a number of major jobs or activities, as shown in Table 2.6.





(a) Draw a Gantt chart.

(b) Develop a CPM network.

(c) Determine the critical path of the network.

(d) Determine the project duration time period.


a.

b.

Trades & Technology

You might also like to view...

Answer the following statement(s) true (T) or false (F)

Asphalt products are the most commonly used roof covering for residential construction.

Trades & Technology

Which of the following is not true of APEC:

a. Like the Crains Group, it has a free trade goal. b. The diversity of its members will make the timing of its goal difficult to achieve. c. Its members are a major U.S. market, and the U.S. is a major customer. d. All of the above are true. e. None of the above is true.

Trades & Technology

The second line of defense against disease agents are cells and chemicals in the:

A. Bloodstream B. Nostrils C. Antigens D. Colostrum

Trades & Technology

How can a heat pump filter drier be differentiated from a standard filter drier?

A) By the 600 psig pressure rating B) By the directional arrows pointing towards both ends of the drier C) By the two copper lines on each end of the drier D) By the shiny, polished appearance of the stainless steel core

Trades & Technology