When inspecting your bus, you must make sure that
a) Rider signaling devices are working
b) Every handhold and railing is secure
c) Emergency exit handles are secure
d) All of the above have been checked
Answer : d) All of the above have been checked
You might also like to view...
Why are computers used for sire and dam selection?
What will be an ideal response?
Which of the following locations is not permitted to be used to connect the grounding electrode at the service equipment?
A. At the weatherhead where the service drop is connected to the service-entrance conductors B. In the meter socket enclosure supplied by an underground service lateral C. In a wireway from the metering equipment to the service equipment D. In a feeder panel if immediately adjacent to the service equipment
The answer is in this format: 5:9. Find the ratio of 200 turns of the primary coil to 800 turns of the secondary coil.
Fill in the blank(s) with the appropriate word(s).
The first step in the PLD programming process is ________
A) design entry B) compilation C) synthesis D) download