Solve the problem. Round to two decimal places unless otherwise indicated.Suppose the cost per ton, y, to build an oil platform of x thousand tons is approximated by y = . What is the cost per ton for x = 10?

A. $11250.00
B. $50.00
C. $478.72
D. $11025.00


Answer: C

Mathematics

You might also like to view...

Evaluate.Evaluate x + y + 27, if x is 37 and y is 62.

A. 125 B. 127 C. 126 D. 99

Mathematics

Find the slope of the line containing the given points.(-3, -4) and (-3, 5)

A. 0
B.
C. not defined
D. - 

Mathematics

The line graph shows the recorded hourly temperatures in degrees Fahrenheit at an airport.  During which two hour period did the temperature increase the most?

A. 10 a.m. to 12 p.m. B. 12 p.m. to 2 p.m. C. 9 a.m. to 11 a.m. D. 10 a.m. to 11 a.m.

Mathematics

Graph the function. ? ?

A.
B.

?


C.

?


D.

?


Mathematics