Technicians always perform this action first when working on an electrical circuit in a residential setting:

A) Turn off power at the service panel.
B) Remove the covers from the affected unit.
C) Call the power company.
D) Test for voltage at the affected unit.


A

Trades & Technology

You might also like to view...

Computer monitors use which method to produce color?

pixelation B. contrast C. additive D. subtractive

Trades & Technology

How does an air-defrost system work?

A) Air from inside the store is directed over the evaporator. B) A warm glycol solution is sprayed on the coil. C) The superheated gas leaving the evaporator is used to melt the ice. D) Hot compressor discharge gas is routed to the evaporator.

Trades & Technology

A section can be drawn by dividing the work into six stages. What is the first stage of this process?

A. dimension B. place all finishing materials C. evaluate the drawing needs D. annotation

Trades & Technology

The neutral axis is approximately sixteenths of the thickness from the outside of the bend, depending on the material and other factors.

Answer the following statement true (T) or false (F)

Trades & Technology