When the owner/engineer's inspector or the resident project representative or the contractor's superintendent leaves the project site for a while, it is permissible to do which of the following:
A. Leave the site without notifying anyone.
B. Leave word that you will be out for a while, but it is not necessary to say where or leave a number.
C. Close the job for the day.
D. Notify your office of your absence and leave a number where you can be reached.
D
You might also like to view...
Many geothermal systems have severe negative effects on the environment
Indicate whether the statement is true or false.Proper recycling and disposal of waste materials is very important, especially when work is being done on ____.?
A. cross-country pipelines? B. shipyards? C. construction sites? D. longshoring operations?
Water is heated in an insulated, constant diameter tube by a 7-kW electric resistance heater. If the water enters the heater steadily at 15°C and leaves at 70°C, determine the mass flow rate of the water.
What will be an ideal response?
A fixed-restriction system operating with a refrigerant undercharge will have:
A) A high system superheat. B) A high subcooling. C) Higher temperature drop across the evaporator. D) A low system superheat.