When the owner/engineer's inspector or the resident project representative or the contractor's superintendent leaves the project site for a while, it is permissible to do which of the following:

A. Leave the site without notifying anyone.
B. Leave word that you will be out for a while, but it is not necessary to say where or leave a number.
C. Close the job for the day.
D. Notify your office of your absence and leave a number where you can be reached.


D

Trades & Technology

You might also like to view...

Many geothermal systems have severe negative effects on the environment

Indicate whether the statement is true or false.

Trades & Technology

Proper recycling and disposal of waste materials is very important, especially when work is being done on ____.?  

A. cross-country pipelines? B. shipyards? C. construction sites? D. longshoring operations?

Trades & Technology

Water is heated in an insulated, constant diameter tube by a 7-kW electric resistance heater. If the water enters the heater steadily at 15°C and leaves at 70°C, determine the mass flow rate of the water.



What will be an ideal response?

Trades & Technology

A fixed-restriction system operating with a refrigerant undercharge will have:

A) A high system superheat. B) A high subcooling. C) Higher temperature drop across the evaporator. D) A low system superheat.

Trades & Technology