La persona que cuenta con autorización para diseñar edificios y supervisar su construcción es el _____.

a. contratista general
b. maestro carpintero
c. supervisor
d. arquitecto


Answer: D

Trades & Technology

You might also like to view...

An EREV is a plug-in hybrid vehicle that runs solely on battery power until the battery becomes discharged to a specified low-level state of charge (SOC), called the  ____________________.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

The maximum current output of a PV module under conditions of a circuit with no resistance is called the ___________.

a. short circuit current b. open circuit voltage c. maximum power point d. None of the above

Trades & Technology

The driver of a vehicle with ESC has turned OFF the stability control system. What will happen the next time the vehicle is driven?

A) It will depend on which driver of the vehicle enters the vehicle. B) The ESC system will return to its default ON status. C) The ESC system will remain OFF until turned back on by the driver. D) None of these

Trades & Technology

Tariffs are lists of services that common carriers perform for the public and the rates charged for them.

Answer the following statement true (T) or false (F)

Trades & Technology