List the steps necessary to implement LOTO.
What will be an ideal response?
• Perform an informational meeting to notify management and employees
• Plan for the shut down
• Determine all sources of energy feeding the equipment or system
• Isolate all energy sources and bring them to a zero energy condition
• Apply locks or tags to the energy sources as approved by the LOTO policy
• Try to start the equipment or system after all energy sources are de-energized (equipment should not start!)
• Perform work maintenance or service activity
You might also like to view...
What are the procedures and practices that are mandated to be completed by personnel to ensure the energy source is disabled prior to work on any piece of equipment called?
A) Hazardous Energy Processes B) Lockout-Tagout C) Lockdown-Tagdown D) Lockup-Tagup
Which of the following is NOT a type of headlamp used on motor vehicles?
A. halogen insert bulb B. fluorescent C. LED lights D. high-intensity discharge (HID)
Architectural drafting is a universal graphic language that uses lines, symbols, and notes to describe a structure to be built.
Answer the following statement true (T) or false (F)
Traditional plank flooring is an acceptable method of flooring
Indicate whether the statement is true or false