A floor system that is sometimes used instead of the joist and girder system is the____.

A. floor truss system
B. floor tie system
C. floor tether system
D. floor join system


Answer: A

Trades & Technology

You might also like to view...

Which of the following is a required qualification for a signal person, per 29 CFR 1926.1428?

a. A minimum of two years of craft experience b. A minimum of one year experience as a crane operator c. The successful completion of either a written or oral test, and a practical test d. The successful completion of a written test or a practical test (but not both)

Trades & Technology

The battleship Maine was sunk by

A. the Spanish. B. an accidental internal explosion on the ship. C. Cuban rebels. D. a mine planted by pro-Cuban Americans. E. None of these choices are correct.

Trades & Technology

The main purpose of installing a furring strip under the first course of beveled wood siding is to _____

a. provide a nailing surface for the siding b. keep insects from getting under the siding c. compensate for the overlap in subsequent rows d. keep moisture from getting under the siding

Trades & Technology

Problem 1.31

The 1.4-kip load P is supported by two wooden members of uniĀ¬form cross section that are joined by the simple glued scarf splice shown. Determine the normal and shearing stresses in the glued splice.

Trades & Technology